Which unloading method suits you? The best unloading method depends on the distance between the mixer truck and the pouring spot, how accessible the site is and the amount of concrete. If the mixer can park right next to the pouring spot, a chute is often enough. For greater distances or heights, you'll usually need a pump.
Unloading methods compared
| Unloading method | Quantity | Reach | Concrete type |
|---|---|---|---|
| Chute | Up to ~4 m³ | Chute 1.5–2.5 m | S3 |
| Wheelbarrow | Small job, hard to reach | Barrowed by hand from the chute | S3 |
| Trailer pump | ~3–7 m³ | Hose up to 25 m | F4 |
| Truck mixer with pump | Larger job, ~9 m³ per delivery | Pump reach 2–24 m | F4 |
Chute.
The mixer truck parks right next to the pour site and lets the concrete run down the chute. The reach is usually about 1.5 to 2.5 metres from the mixer.
The chute works well if the truck can get close safely. You provide enough people and tools, and you take care of compacting and finishing the concrete yourself.

Wheelbarrow.
You use wheelbarrows to move the concrete from the chute to the pour site. This works best for smaller volumes and a short, level route.
Working with concrete takes time and effort. Make sure you have enough people, sturdy wheelbarrows and a clear route. Keep in mind that the mixer truck can't wait indefinitely.

Trailer pump.
A trailer pump moves the concrete through a hose to hard-to-reach spots. Think of a back garden, a narrow passage or a pour site behind a house.
The mixer truck and the pump are two separate vehicles. So check that there's enough room to set them both up. The included hose length and pouring time are shown in your order.